SMART ENERGY


Energy Saving: A Beginning I


t’s easy to talk about energy sav- ings – it’s much harder to make it happen – not just once for a


specific project, but again and again on numerous project/programs on a continuing basis. Note that energy saving/dollar saving doesn’t necessarily require significant capital expenditures or even any capital expenditure at all. It begins with leadership and that leadership must begin at the top! Two major first steps are needed to make


that happen: 1. A WRITTEN, WELL PUBLI- CIZED COMMITMENT FROM THE TOP. It takes this “at the top” leadership to make certain all under- stand that energy saving is money saving and that is good for all.


2. A specific person is held accountable for making energy saving a reality. If these two items do not happen –


the energy saving program is essen- tially doomed to failure. Addressing item 1 - without this


written, well-publicized commitment from the top, energy saving will tend to end up on the bottom of each per- son’s priority list; this includes hourly team members. Too often, the CEO or Plant Manager talks about energy sav- ing but then you go out into the facil- ity and no one – absolutely no one - is involved in an organized manner that will result in documented energy sav- ing. Tere is no letter of commitment posted on any bulletin board. Tere is no updating that shows any history or progress. Soon energy saving becomes a “thing” of the past. A written com- mitment is a MUST item. Addressing item 2 is also criti-


cal. A specific person MUST be held accountable for making documented energy savings happen. Again, that person needs to be recognized as the “go-to” individual. It can’t just be an “oh – by the way” add-on to his/ her numerous other duties. He needs clear specific energy saving objec- tives and it’s critical that reporting on these objectives be part of a regular reporting system.


Again, as has been pointed out in


the past, it is easier to save $50,000 in energy than it is to get the profit from $1,000,000 in new business. Make certain that all employees rec- ognize just how many dollars in sales it takes to generate $1,000 or $10,000 in profit (Money that is “put in the bank.”) It’s vital that everyone rec- ognizes just how hard it is to “make a buck” in the metalcasting industry. Run your own survey – you’ll be surprised. (When I ask this question, the answer I virtually always hear is “oh, if the metalcaster sells $1,000 of casting, I think about $300-400 is “put in the bank”) Tis survey will help all employees to understand the real impact of their energy-saving efforts. Te energy-saving effort is as important as scrap reduction, down time reduction and safety and it must be reported and publicized. It’s all part of a culture in a well-run facility. All of these efforts will provide those savings year after year. Checking for potential energy saving opportunities can happen in a variety of ways or combinations of ways. Te simplest is to designate one individual to do a “walk-through” au- dit and report the findings. Te single individual “walk-through” is a start. Te individual will note that some unnecessary lights are on – a blower or conveyor is running even though there is no production scheduled. He may also note furnaces are not covered or he hears air leaks. Usually there is no organized follow-up. It’s just “a guy” walking through the facility. Often the individual does not have the authority to make things happen. Tere is no lasting impact from the effort. Another approach is to ask one


of the U.S. Department of Energy Industrial Assessment Centers to conduct an energy assessment in your facility. Te Industrial Assessment Centers are located at 28 universities across the country. Teir locations can be found at: ŚƩƉƐ://ǁǁǁ.ĞŶĞƌŐLJ. ŐŽǀ/ĞĞƌĞ/ĂŵŽ/ůŽĐĂƟŽŶƐ-ŝŶĚƵƐƚƌŝĂů-


ROBERT EPPICH (LEAD AUTHOR), EPPICH TECHNOLOGIES (SYRACUSE, INDIANA), CINDY BELT, METALS ENERGY MANAGEMENT (CALLAHAN, FLORIDA), AND BRIAN REINKE, TDI CONSULTING (LEMONT, ILLINOIS)


ĂƐƐĞƐƐŵĞŶƚ-ĐĞŶƚĞƌƐ. Tey are generally operated out of the Industrial Engi- neering Department at the university. A team, led by an IAC Director, will spend one day at your facility. Tey will provide a thorough report and in about 6 months they will re-contact the facility to find out which of their recommendations have been imple- mented. Many of these recommenda- tions do not require capital expendi- ture. To gain maximum value from this IAC assessment it is important that a facility engineer accompany the IAC team. Too often, the IAC report then just sits on someone’s shelf because an energy saving team has not been established to evaluate and utilize the value of the IAC assessment. You company can also organize an


energy program as described in the “Guidelines for Energy Management” manual. Tis manual breaks down seven main steps to energy saving: 1) Make the commitment; 2) assess performance; 3) set goals; 4) create an action plan; 5) implement the ac- tion plan; 6) evaluate progress; and 7) recognize achievements. Te first step requires written


commitment from the top. Without this leadership, the program will fail, and successfully going through steps 2 through 7 will be impossible. Like- wise, the last step is vital. Give credit to those who are helping achieve your goals. Use pizza parties, company-wide announcements or simple, personal “thank-yous” to let the team know their input and work is valued. Te EPA Energy Star program cre- ates a team-oriented atmosphere that an individual walk-through or IAC assessment can’t. However, it should be noted that once the team has been put in place, their efforts can be supple- mented by an IAC assessment. Your feedback regarding your


company’s energy saving achieve- ments will be/is appreciated. Let us know the specifics of your energy saving approach and more impor- tantly – the results.


May 2018 MODERN CASTING | 51


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76